wilba_mb_6582_control_surface_construction_guide
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
wilba_mb_6582_control_surface_construction_guide [2020/12/12 18:08] – typo m00dawg | wilba_mb_6582_control_surface_construction_guide [2020/12/15 15:13] (current) – Added link to JST cabling method m00dawg | ||
---|---|---|---|
Line 124: | Line 124: | ||
**SOLDERING RIBBON CABLE BETWEEN BASE AND CS PCBS** | **SOLDERING RIBBON CABLE BETWEEN BASE AND CS PCBS** | ||
+ | |||
+ | **Note** There is a potentially better method mentioned on the forums ([[http:// | ||
This is a slightly difficult process, so I'll give as much advice as possible. | This is a slightly difficult process, so I'll give as much advice as possible. |
wilba_mb_6582_control_surface_construction_guide.1607796491.txt.gz · Last modified: 2020/12/12 18:08 by m00dawg