This shows you the differences between two versions of the page.
Next revision | Previous revision Last revision Both sides next revision | ||
gslug [2011/08/31 20:54] gslug created |
gslug [2011/12/11 23:21] gslug |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | Hello, I'm gslug (or Kevin). I only recently stumbled accross MIDIbox and am now in the process of collecting parts for an MB6582. Whilst waiting for the last parts to arrive I am attempting to get to grips with Eagle and lay out a PCB for a C64 replacement PSU. | + | Hello, I'm gslug (or Kevin). <del>I only recently stumbled across MIDIbox and am now in the process of collecting parts for an MB6582. Whilst waiting for the last parts to arrive I am attempting to get to grips with Eagle and lay out a PCB for a C64 replacement PSU. |
My next build will probably be a Midibox CV as I have become rather addicted to collecting vintage analog gear. | My next build will probably be a Midibox CV as I have become rather addicted to collecting vintage analog gear. | ||
- | More to follow once I start building things. | + | More to follow once I start building things.</del> |
+ | |||
+ | Thanks to TK, Smash, Wilba and everyone else for this fantastic project | ||
+ | |||
+ | As of 11th December 2011, I have a completed MB6582 and PSU (both finished around September), though I need to get around to acquiring another 4 SIDs. I have put the Midibox CV on hold in anticipation of V2...... | ||
+ | |||
+ | **Current projects:** | ||
+ | |||
+ | Seq V4l: Parts ordered for two. One core LPC completed. | ||
+ | |||
+ | MB909: 9090 PCBs and parts ordered. | ||
+ | |||
+ | |||
+ | **Future plans:** | ||
+ | |||
+ | Seq V4: Waiting for my place in the bulk order for the control surface PCB. I need to source a case as I seem to have missed that order:-( | ||
+ | |||
+ | Midification: Add Midi (or at least CV/Gate) to a Roland SH-1000. | ||
+ | |||
+ | x0xb0x: I was going to order a kit from Willzyx, but the 9090 order appeared and somewhat reduced my bank balance! Soon. | ||
+ | |||
+ | Modular: Long term - I need a bigger flat first! | ||
+ | |||
+ | I think that's it. | ||
+ |