This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
seqv4plus_enc-plate [2017/09/12 20:05] latigid_on [BOM] |
seqv4plus_enc-plate [2017/09/12 20:06] latigid_on [Assembly] |
||
---|---|---|---|
Line 61: | Line 61: | ||
* At this point, check again that there are no soldered joints bridging the two PCBs. | * At this point, check again that there are no soldered joints bridging the two PCBs. | ||
- | We need to first decide how the case will come together, but it is wise to now align the mounting washers. Lastly the Matias switches are then mounted in the Plate PCB, and are soldered below. | + | We need to first decide how the case will come together, but it is wise to now align the mounting washers. Lastly the Matias switches are mounted in the Plate PCB, and are soldered below. |
* Keep in mind that once the switches are in, the only way to separate the two PCBs is to remove the switches! | * Keep in mind that once the switches are in, the only way to separate the two PCBs is to remove the switches! |